The Eli's Park Project
Led by Site Workshop and our design team, The Eli's Park Project will continue our partnership with Seattle Parks and Recreation in design development for the Burke-Gilman Playground Park located at 5201 Sandpoint Way NE. This phase will result in design documents including civil engineering reports and integrated art elements. This phase is estimated to be completed by February 2020.
Up to $25K
Rolling
One-time $99 fee · Includes AI drafting + templates + PDF export
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
Washington Wildlife and Recreation Program - Local Parks Category
Washington State Recreation and Conservation Office — up to $5000001M
Los Angeles Convention Center Expansion and Modernization Project
Engineering Bureau, Public Works — up to $2365.1M
Child Care: Subsidy
Scholar Fund — up to $71M
CONGESTION MITIGATION AIR QUALITY - FED
Chicago Department of Transportation — up to $64.9M
ACES @ Chase
Area Cooperative Educational Services — up to $55.7M
LAHSA-Measure A
Housing Department, Los Angeles — up to $54.9M