Linden Orchard P-Patch
Rebuild the existing fence that separates the P-Patch from the paved alley. The fence is no longer stable/secure, and the wood has deteriorated to the point it cannot hold fasteners or be repaired. The fence is approximately 4' tall and about 36' long (in 3 sections). It has grape and kiwi growing in it in the east sections and is interrupted by a trellis entry that is to remain.
Up to $2K
Rolling
One-time $99 fee · Includes AI drafting + templates + PDF export
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
Washington Wildlife and Recreation Program - Local Parks Category
Washington State Recreation and Conservation Office — up to $5000001M
Los Angeles Convention Center Expansion and Modernization Project
Engineering Bureau, Public Works — up to $2365.1M
Child Care: Subsidy
Scholar Fund — up to $71M
CONGESTION MITIGATION AIR QUALITY - FED
Chicago Department of Transportation — up to $64.9M
ACES @ Chase
Area Cooperative Educational Services — up to $55.7M
LAHSA-Measure A
Housing Department, Los Angeles — up to $54.9M