Parents Association of Stuyvesant High School
Redesign and Renovate the art and music wing at SHS = Assessment and design, theater multimedia control center, theater sound system, theater projector TV's (2), theatre lighting upgrade, theater painting, carpet and stage floor replacement, classroom sound system (3), Classroom interactive boards and accessories, classroom painting and other renovations (3), classroom instrument and sheet music storage (3), office renovation, musical instruments, and renovation labor cost.
Up to $0K
Rolling
One-time $99 fee · Includes AI drafting + templates + PDF export
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
Los Angeles Convention Center Expansion and Modernization Project
Engineering Bureau, Public Works — up to $2365.1M
Fred D. Wish Museum School
City of Hartford — up to $63.9M
LAHSA-Measure A
Housing Department, Los Angeles — up to $54.9M
New York State Department of Labor (NYSDOL) Workforce Development Training (WDT) Program
Labor — up to $25M
CALNET NextGen Services (Crown Castle)
Information Technology Agency — up to $24M
Program Open Space
Montgomery County MD / State of Maryland — up to $14.8M