New York Restoration Project
Renovation = Re-engineering of cathodic protection against corrosion, replacing corroded structural steel, and re-welding a failed structural pile, without this work the boathouse will sink.
Up to $257K
Rolling
One-time $749 fee · Includes AI drafting + templates + PDF export
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
Los Angeles Convention Center Expansion and Modernization Project
Engineering Bureau, Public Works — up to $2365.1M
Child Care: Subsidy
Scholar Fund — up to $71M
CONGESTION MITIGATION AIR QUALITY - FED
Chicago Department of Transportation — up to $64.9M
ACES @ Chase
Area Cooperative Educational Services — up to $55.7M
LAHSA-Measure A
Housing Department, Los Angeles — up to $54.9M
ACES @ Bassett
Area Cooperative Educational Services — up to $52.4M