Hudson River Park Trust
(1) - Strip existing roof surface to remove the remainingineffective waterproofing membrane, demolish seteriorated concrete structural planks, repair and patch the existing concrete from the mezzanine level to maintain structural capacity sufficient for c
Up to $500K
Rolling
One-time $749 fee · Includes AI drafting + templates + PDF export
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
Employee Training Incentive Program
Empire State Development — up to $125M
National Fish And Wildlife Foundation Grants
National Fish And Wildlife Foundation — up to $51.3M
Climate Imperative Foundation Grants
Climate Imperative Foundation — up to $31.2M
Conservation International Foundation Grants
Conservation International Foundation — up to $31.2M
Proposition 4 – Nature Based
Santa Monica Mountains Conservancy — up to $25M
Proposition 4 Wildfire
Santa Monica Mountains Conservancy — up to $20.5M