West Prep Academy
Installall hard wood floors on the auditorium stage, mirrors for dance classes backstage, new control room/projection room, electrical wiring for AV equipment, accommodating seats, curtains, lighting deck, lighting equipment, surround sound system, video projection system with monitors on the side and main stage, AV rack to control sound and visual input and output, a PPD system to broadcast throughout building and into atrium and garden space directly next to auditorium, acoustical panels, proper ventillation/air conditioning, and mosiac mural that reflects the technology and arts theme that runs through the building.
Up to $0K
Rolling
One-time $99 fee · Includes AI drafting + templates + PDF export
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
Los Angeles Convention Center Expansion and Modernization Project
Engineering Bureau, Public Works — up to $2365.1M
Fred D. Wish Museum School
City of Hartford — up to $63.9M
LAHSA-Measure A
Housing Department, Los Angeles — up to $54.9M
New York State Department of Labor (NYSDOL) Workforce Development Training (WDT) Program
Labor — up to $25M
CALNET NextGen Services (Crown Castle)
Information Technology Agency — up to $24M
Program Open Space
Montgomery County MD / State of Maryland — up to $14.8M